Penerapan Total Productive Maintenance pada Mesin 3 Roll Quenching di CV Ruser Indonesia

Renaldi Irawan, Irvan (2021) Penerapan Total Productive Maintenance pada Mesin 3 Roll Quenching di CV Ruser Indonesia. Project Report. IPB University.

[img] Text (Cover)
J3K118073-01-Irvan Renaldi Irawan-cover.pdf

Download (1MB)
[img] Text (Ringkasan)
J3K118073-02-Irvan Renaldi Irawan-ringkasan.pdf

Download (761kB)
[img] Text (Daftar isi)
J3K118073-03-Irvan Renaldi Irawan-daftarisi.pdf

Download (1MB)
[img] Text (Pendahuluan)
J3K118073-04-Irvan Renaldi Irawan-pendahuluan.pdf

Download (923kB)
[img] Text (Tugas Akhir (Full Text))
J3K118073-05-Irvan Renaldi Irawan-tugasakhir (1).pdf
Restricted to Registered users only

Download (2MB)
Official URL: http://sv.ipb.ac.id
Item Type: Monograph (Project Report)
Uncontrolled Keywords: Mean Time Between Failure, Mean Time To Repair, Mean Downtime, Mesin 3 Roll Quenching, Overall Equipment Effectiveness
Subjects: Student Project Report
Divisions: School of Vocational Studies > Industrial Management
Depositing User: Manajemen Industri SV IPB
Date Deposited: 27 Aug 2021 16:36
Last Modified: 27 Aug 2021 16:36
URI: https://ereport.ipb.ac.id/id/eprint/7751

Actions (login required)

View Item View Item