Tarigan, Luqman Hakim (2020) Penerapan Total Productive Maintenace di FM Factory Pada Mesin Slabcutter dan Extruder II di PT Bridgestone Sumatra Rubber Estate. Project Report. IPB University.
Text (Cover)
J3K118006-01-Luqman Hakim Tarigan-Cover.pdf Download (3MB) |
|
Text (Ringkasan)
3K118006-02-Luqman Hakim Tarigan-Ringkasan.pdf Download (3MB) |
|
Text (Daftar isi)
3K118006-03-Luqman Hakim Tarigan-Daftar isi.pdf Download (3MB) |
|
Text (Pendahuluan)
3K118006-04-Luqman Hakim Tarigan-Pendahuluan.pdf Download (3MB) |
|
Text (Tugas Akhir)
Tugas Akhir_Luqman Hakim Tarigan_J3K118007.pdf Restricted to Registered users only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | slabcutter, extruder II, Overall Equipment Effectiveness (OEE),kehandalan, general workshop, Root Cause Analysis (RCA),One Point Lesson (OPL), Total Productive Maintenance (TPM) |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 31 Jan 2022 02:01 |
Last Modified: | 31 Jan 2022 02:01 |
URI: | https://ereport.ipb.ac.id/id/eprint/8862 |
Actions (login required)
View Item |