Bagus Nurjaya, Ide (2021) Penerapan Total Productive Maintenance pada Mesin Pengemasan Cup Susu Pasteurisasi di CV Cita Nasional Semarang Jawa Tengah. Project Report. IPB University.
Text (Cover)
J3K118113-01-IDE BAGUS NURJAYA-cover.pdf Download (1MB) |
|
Text (Ringkasan)
J3K118113-02-IDE BAGUS NURJAYA-ringkasan.pdf Download (1MB) |
|
Text (Daftar Isi)
J3K118113-03-IDE BAGUS NURJAYA-daftarisi.pdf Download (1MB) |
|
Text (Pendahuluan)
J3K118113-04-IDE BAGUS NURJAYA-pendahuluan.pdf Download (1MB) |
|
Text (Tugas Akhir (Full Text))
J3K118113-05-IDE BAGUS NURJAYA-tugasakhir.pdf Restricted to Registered users only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | autonomous maintenance, cup, cutter, heater, main time between failure, main time to repair, main down time, overall equipment effectiveness, budaya 5S, sensor tanggal |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 02 Sep 2021 04:39 |
Last Modified: | 02 Sep 2021 04:39 |
URI: | https://ereport.ipb.ac.id/id/eprint/7938 |
Actions (login required)
View Item |