Penerapan Total Productive Maintenance pada Grup Produksi Spinning VII di PT XYZ

Saraswati, Ayu (2021) Penerapan Total Productive Maintenance pada Grup Produksi Spinning VII di PT XYZ. Project Report. IPB University.

[img] Text (Cover)
J3K118127-01-Ayu-cover.pdf

Download (3MB)
[img] Text (Ringkasan)
J3K118127-02-Ayu-ringkasan.pdf

Download (3MB)
[img] Text (Daftar Isi)
J3K118127-03-Ayu-Daftar Isi.pdf

Download (1MB)
[img] Text (Pendahuluan)
J3K118127-05-Ayu-Pendahuluan.pdf

Download (2MB)
[img] Text (Tugas Akhir (Full Text))
Tugas Akhir.pdf
Restricted to Registered users only

Download (3MB)
Official URL: https://sv.ipb.ac.id
Item Type: Monograph (Project Report)
Uncontrolled Keywords: mean time between failure, mean time to repair, mean down time, overall equipment effectiveness, availability, performance, quality yield.
Subjects: Student Project Report
Divisions: School of Vocational Studies > Industrial Management
Depositing User: Manajemen Industri SV IPB
Date Deposited: 19 Aug 2021 08:37
Last Modified: 19 Aug 2021 08:37
URI: https://ereport.ipb.ac.id/id/eprint/6942

Actions (login required)

View Item View Item