Saraswati, Ayu (2021) Penerapan Total Productive Maintenance pada Grup Produksi Spinning VII di PT XYZ. Project Report. IPB University.
Text (Cover)
J3K118127-01-Ayu-cover.pdf Download (3MB) |
|
Text (Ringkasan)
J3K118127-02-Ayu-ringkasan.pdf Download (3MB) |
|
Text (Daftar Isi)
J3K118127-03-Ayu-Daftar Isi.pdf Download (1MB) |
|
Text (Pendahuluan)
J3K118127-05-Ayu-Pendahuluan.pdf Download (2MB) |
|
Text (Tugas Akhir (Full Text))
Tugas Akhir.pdf Restricted to Registered users only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | mean time between failure, mean time to repair, mean down time, overall equipment effectiveness, availability, performance, quality yield. |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 19 Aug 2021 08:37 |
Last Modified: | 19 Aug 2021 08:37 |
URI: | https://ereport.ipb.ac.id/id/eprint/6942 |
Actions (login required)
View Item |