Arif Wicaksana, Satria (2020) EVALUASI PENERAPAN TOTAL PRODUCTIVE MAINTENANCE PADA DEPARTEMEN LEAD PART DI PT NON FERINDO UTAMA TANGERANG BANTEN. Project Report. IPB University.
Text (Cover)
J3K117014-01-Satria Arif Wicaksana-Cover.pdf Download (1MB) |
|
Text (Ringkasan)
J3K117014-02-Satria Arif Wicaksana-Ringkasan.pdf Download (848kB) |
|
Text (Daftar Isi)
J3K117014-03-Satria Arif Wicaksana-Daftarisi.pdf Download (790kB) |
|
Text (Pendahuluan)
J3K117014-04-Satria Arif Wicaksana-Pendahuluan.pdf Download (767kB) |
|
Text (Tugas Akhir (Full Text))
J3K117014-05-Satria Arif Wicaksana-Tugasakhir.pdf Restricted to Registered users only Download (1MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Detail Blower Drop, Heater Mould, Injection, Settingan Heater Mould, Settingan Injection, Spearpart Mould Patah |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 08 Oct 2020 07:21 |
Last Modified: | 08 Oct 2020 07:21 |
URI: | https://ereport.ipb.ac.id/id/eprint/4395 |
Actions (login required)
View Item |