Putriyuana, Azizah Nurul (2022) Penerapan Total Productive Maintenance pada Mesin Sumitomo di PT Tokyo Seimitsu Buhin Indonesia, Bekasi, Jawa Barat. Project Report. IPB University.
Text (Cover)
J3K119029-01-Azizah-cover.pdf Download (1MB) |
|
Text (Ringkasan)
J3K119029-02-Azizah-ringkasan.pdf Download (766kB) |
|
Text (Daftar Isi)
J3K119029-03-Azizah-daftarisi.pdf Download (898kB) |
|
Text (Pendahuluan)
J3K119029-04-Azizah-pendahuluan.pdf Download (778kB) |
|
Text (Tugas Akhir (Full Text))
tugasakhir.pdf Restricted to Repository staff only Download (2MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Total Productive Maintenance, sistem perawatan dan perbaikan masin, Perhitungan kehandalan, Overall Equipment Effectiveness. |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 26 Aug 2022 04:24 |
Last Modified: | 26 Aug 2022 04:24 |
URI: | https://ereport.ipb.ac.id/id/eprint/11602 |
Actions (login required)
View Item |