Sholihah, Firdausi Ni’matus (2022) Implementasi Pengendalian Kualitas Assembly engine Untuk Menurunkan Biaya Produksi Dengan Menerapkan Metode Seven Tools di PT XYZ. Project Report. IPB University.
Text (Cover)
J3K119052-01-Firdausi-Cover.pdf Download (629kB) |
|
Text (Ringkasan)
J3K119052-02-Firdausi-Ringkasan.pdf Download (450kB) |
|
Text (Daftar Isi)
J3K119052-03-Firdausi-Daftarisi.pdf Download (534kB) |
|
Text (Pendahuluan)
J3K119052-04-Firdausi-Pendahuluan.pdf Download (461kB) |
|
Text (Tugas Akhir (Full Text))
Tugasakhir.pdf Restricted to Repository staff only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Assembly Engine, Efisiensi Biaya, Firing, Gugus Kendali Mutu, Pengendalian Kualitas, Seven Tools, Siklus PDCA 8 Steps |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 23 Aug 2022 02:35 |
Last Modified: | 23 Aug 2022 02:35 |
URI: | https://ereport.ipb.ac.id/id/eprint/11377 |
Actions (login required)
View Item |