Alifya Hutamy, Siti (2021) Optimalisasi Tata Letak pada Area Produksi Copper di PT Sutrakabel Intimandiri Bogor. Project Report. IPB University.
Text (Cover)
J3K118081-01-SITI ALIFYA-COVER.pdf Download (8MB) |
|
Text (Ringkasan)
J3K118081-02-SITI ALIFYA-RINGKASAN.pdf Download (1MB) |
|
Text (Daftar Isi)
J3K118081-03-SITI ALIFYA-DAFTAR ISI.pdf Download (4MB) |
|
Text (Pendahuluan)
J3K118081-04-SITI ALIFYA-PENDAHULUAN.pdf Download (4MB) |
|
Text (Tugas Akhir (Full Text))
J3K118081-Siti Alifya Hutamy.pdf Restricted to Registered users only Download (17MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Additional Information: | total closeness rating, jarak aktivitas, nilai antar aktivitas |
Uncontrolled Keywords: | aliran āUā, optimalisasi, product layout, produksi Copper, rectilinear, total closeness rating, dan smelting |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 25 Aug 2021 03:12 |
Last Modified: | 25 Aug 2021 03:12 |
URI: | https://ereport.ipb.ac.id/id/eprint/7390 |
Actions (login required)
View Item |