Optimalisasi Tata Letak pada Area Produksi Copper di PT Sutrakabel Intimandiri Bogor

Alifya Hutamy, Siti (2021) Optimalisasi Tata Letak pada Area Produksi Copper di PT Sutrakabel Intimandiri Bogor. Project Report. IPB University.

[img] Text (Cover)
J3K118081-01-SITI ALIFYA-COVER.pdf

Download (8MB)
[img] Text (Ringkasan)
J3K118081-02-SITI ALIFYA-RINGKASAN.pdf

Download (1MB)
[img] Text (Daftar Isi)
J3K118081-03-SITI ALIFYA-DAFTAR ISI.pdf

Download (4MB)
[img] Text (Pendahuluan)
J3K118081-04-SITI ALIFYA-PENDAHULUAN.pdf

Download (4MB)
[img] Text (Tugas Akhir (Full Text))
J3K118081-Siti Alifya Hutamy.pdf
Restricted to Registered users only

Download (17MB)
Official URL: https://sv.ipb.ac.id
Item Type: Monograph (Project Report)
Additional Information: total closeness rating, jarak aktivitas, nilai antar aktivitas
Uncontrolled Keywords: aliran ā€œUā€, optimalisasi, product layout, produksi Copper, rectilinear, total closeness rating, dan smelting
Subjects: Student Project Report
Divisions: School of Vocational Studies > Industrial Management
Depositing User: Manajemen Industri SV IPB
Date Deposited: 25 Aug 2021 03:12
Last Modified: 25 Aug 2021 03:12
URI: https://ereport.ipb.ac.id/id/eprint/7390

Actions (login required)

View Item View Item