Hanan Aqilah, Yasmin (2021) Penerapan dan Evaluasi Total Productive Maintenance pada Production Department PT Koyota International Group. Project Report. IPB University.
Text (Cover)
J3K218219-01-Yasmin Hanan Aqilah-Cover.pdf Download (727kB) |
|
Text (Ringkasan)
J3K218219-02-Yasmin Hanan Aqilah-Ringkasan.pdf Download (571kB) |
|
Text (Daftar Isi)
J3K218219-03-Yasmin Hanan Aqilah-Daftar Isi.pdf Download (615kB) |
|
Text (Pendahuluan)
J3K218219-04-Yasmin Hanan Aqilah-Pendahuluan.pdf Download (612kB) |
|
Text (Tugas Akhir (Full Text))
J3K218219-05-Yasmin Hanan Aqilah-Tugas Akhir.pdf Restricted to Registered users only Download (2MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Failure tags, Mean Time Between Failure, Mean Down Time, Mean Time to Repair, Overall Equipment Effectiveness |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 20 Aug 2021 06:20 |
Last Modified: | 20 Aug 2021 06:20 |
URI: | https://ereport.ipb.ac.id/id/eprint/7128 |
Actions (login required)
View Item |