Aditya Sukmayadi, Devariandi (2020) PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DAN MENGHITUNG EFEKTIVITAS DI STASIUN KERJA RAW MILL DAN KILN PADA PLANT 11 DI PT INDOCEMENT TUNGGAL PRAKARSA TBK, CITEREUP BOGOR. Project Report. IPB University.
Text (Cover)
J3K217222-01-Devariandi Aditya Sukmayadi-Cover.pdf Download (1MB) |
|
Text (Ringkasan)
J3K217222-02-Devariandi Aditya Sukmayadi-Ringkasan.pdf Download (1MB) |
|
Text (Daftar Isi)
J3K217222-03-Devariandi Aditya Sukmayadi-Daftarisi.pdf Download (1MB) |
|
Text (Pendahuluan)
J3K217222-04-Devariandi Aditya Sukmayadi-Pendahuluan.pdf Download (1MB) |
|
Text (Tugas Akhir (Full Text))
J3K217222-05-Devariandi Aditya Sukmayadi-Tugasakhir.pdf Restricted to Registered users only Download (2MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Mean Downtime, Mean Time Between Failure, Mean Time To Repair, Overall Equipment Effectiveness di Stasiun Kerja Raw Mill dan Kiln |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 07 Oct 2020 01:52 |
Last Modified: | 07 Oct 2020 01:52 |
URI: | https://ereport.ipb.ac.id/id/eprint/4215 |
Actions (login required)
View Item |