Dwi Lestari, Nadira (2020) Evaluasi Penerapan Total Productive Maintenance Mesin CC Line pada Produksi Wire Rod di PT Karya Sumiden Indonesia. Project Report. IPB University.
Text (Cover)
J3K117047-01-Nadira Dwi Lestari-Cover.pdf Download (3MB) |
|
Text (Ringkasan)
J3K117047-02-Nadira Dwi Lestari-Ringkasan.pdf Download (3MB) |
|
Text (Daftar Isi)
J3K117047-03-Nadira Dwi Lestari- Daftar Isi.pdf Download (3MB) |
|
Text (Pendahuluan)
J3K117047-04-Nadira Dwi Lestari-Pendahuluan.pdf Download (3MB) |
|
Text (Tugas Akhir (Full Text))
J3K117047-05-Nadira Dwi Lestari-Tugas Akhir.pdf Restricted to Registered users only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | budaya kerja 5S, kehandalan mesin, mesin kritis, OEE, preventive maintenance. |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 28 Aug 2020 02:35 |
Last Modified: | 28 Aug 2020 02:35 |
URI: | https://ereport.ipb.ac.id/id/eprint/2525 |
Actions (login required)
View Item |