Pradestin, Isna (2020) Evaluasi Penerapan Total Productive Maintenance Produksi Kabel NFA2X 2x10 mm2 di PT Magnakabel Nusantara Bogor, Jawa Barat. Project Report. IPB University.
Text (Cover)
J3K117139-01-Isna Pradestin-Cover.pdf Download (945kB) |
|
Text (Ringkasan)
J3K117139-02-Isna Pradestin-Ringkasan.pdf Download (893kB) |
|
Text (Daftar Isi)
J3K117139-03-Isna Pradestin-Daftarisi.pdf Download (1MB) |
|
Text (Pendahuluan)
J3K117139-04-Isna Pradestin-Pendahuluan.pdf Download (919kB) |
|
Text (Tugas Akhir (Full Text))
J3K117139-05-Isna Pradestin-Tugasakhir.pdf Restricted to Registered users only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | mean time between failure, mean time to repair, mean down time, overall equipment effectiveness, availability, performance, quality yield. |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 02 Sep 2020 16:03 |
Last Modified: | 02 Sep 2020 16:03 |
URI: | https://ereport.ipb.ac.id/id/eprint/2048 |
Actions (login required)
View Item |