Pramytha, Selvia Bunga (2022) Teknik Tata Cara dan Pengukuran Kerja Proses Chamfer Stiffener untuk Minor Assy Endbeam PPCW di PT INKA (Persero). Project Report. IPB University.
Text (Cover)
J3K119121-Selvia Bunga Pramytha-Cover.pdf Download (1MB) |
|
Text (Ringkasan)
J3K119121-Selvia Bunga Pramytha-Ringkasan.pdf Download (913kB) |
|
Text (Daftar Isi)
J3K119121-Selvia Bunga Pramytha-Daftar Isi.pdf Download (854kB) |
|
Text (Pendahuluan)
J3K119121-Selvia Bunga Pramytha-Pendahuluan.pdf Download (903kB) |
|
Text (Tugas Akhir (Full Text))
J3K119121-Selvia Bunga Pramytha-tugasakhir(lock).pdf Restricted to Repository staff only Download (3MB) |
Official URL: https://sv.ipb.ac.id
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | ekonomi gerakan, ergonomi, operator atau pekerjaan yang diamati, pengukuran kerja metode jam henti (stopwatch), peta kerja |
Subjects: | Student Project Report |
Divisions: | School of Vocational Studies > Industrial Management |
Depositing User: | Manajemen Industri SV IPB |
Date Deposited: | 23 Aug 2022 04:54 |
Last Modified: | 23 Aug 2022 04:54 |
URI: | https://ereport.ipb.ac.id/id/eprint/11297 |
Actions (login required)
View Item |